Keeping Cargill Hatchery Running in Harrisonburg, Virginia

At a Cargill Hatchery, replacing major mechanical equipment meant working around an operation that could not simply pause. The building needed to stay open, egg production needed to continue, and temperatures had to remain carefully controlled throughout the work.

Blauch Brothers worked with general contractor Nielsen Builders on a phased design-build upgrade that renewed central equipment and connected systems throughout the facility. The plan brought the work to each part of the building in turn, rather than shutting everything down at once.

Aerial view of a Cargill hatchery roof with rooftop units and the new outdoor central plant installed by Blauch Brothers

A Central Plant and Room-by-Room Upgrade

Our team installed two boilers, two chillers, a fluid cooler, new pumps, and rooftop units. Boilers provide heating, while chillers supply cooling. Together with the pumps and controls, they form part of the infrastructure that helps maintain the conditions the facility needs.

The scope also included utility connections to the incubators and controls installed by Blauch Brothers. Our crews welded supports for the piping, giving those systems a place within the facility's mechanical layout.

New chiller plant, pumps and insulated piping on welded pipe supports outside the Cargill hatchery

Phasing Around Production

The challenge was not just installing equipment. It was deciding when and where each part of the work could happen while the hatchery continued operating. Our team approached the upgrade in roughly four phases, beginning with the central heating and cooling plant and then moving through the building room by room.

That sequence mattered because each area had specific temperature requirements. The team also followed the facility's safety procedures while working around an active operation. Production continued throughout the project.

Blauch Brothers technician working on mechanical equipment beside a site team member in safety gear

Planning Around What Matters

The hatchery project shows how a mechanical upgrade can be organized around the needs of the people who rely on a facility every day. Working with Nielsen Builders, our team brought equipment, controls, and field installation together in a plan that accounted for the operation as well as the construction.

Since 1954, family-owned Blauch Brothers has helped commercial and industrial clients across the Shenandoah Valley with HVAC, plumbing, and piping. If your facility needs a mechanical upgrade while operations continue, talk with our team.

Aerial view of the completed central plant with chillers, fluid cooler and piping beside the hatchery building

More PROJECTS

Next
Next

Process Piping at Virginia Poultry Growers in Hinton, Virginia