When Blauch Brothers joined a daycare construction project at Sentara Martha Jefferson, work was already underway, and several mechanical challenges needed to be addressed. Working alongside Lantz Construction, the owner, and the engineer, our team stepped in to take on the mechanical scope and help find solutions that would keep the project moving forward.
Taking On the Mechanical Scope
Our work included heating and cooling split systems and VAV boxes with electric reheat. While these are familiar systems for our team, coordinating their installation within the existing project conditions presented some challenges.
One of the biggest issues involved the attic ductwork. The structural conditions in the attic didn’t align with what had been anticipated during design, making the original ductwork layout difficult to install as planned.
Putting Our VDC Capabilities to Work
Rather than trying to force a layout that didn’t fit, our team worked with Lantz Construction, the owner, and the engineer to develop a practical solution.
Our in-house Virtual Design and Construction (VDC) team played an important role in resolving the conflicts. By evaluating the actual building conditions and coordinating the mechanical layout, we helped identify a workable solution that accounted for the available space and structural constraints.
This coordination allowed the project team to resolve the attic conflicts and move forward with the mechanical installation.
Being a Partner Others Can Count On
Not every project goes according to plan. When challenges come up, having the right people involved can make all the difference.
For Blauch Brothers, this project was an opportunity to support long-term relationships, bring our technical expertise to the table, and help the entire project team work through a difficult situation.
Since 1954, family-owned Blauch Brothers has provided HVAC, plumbing, and piping services to commercial and industrial customers throughout the Shenandoah Valley and surrounding areas.
Whether you’re planning a new project or working through challenges on an existing one, our team is here to help.
More PROJECTS
When Blauch Brothers joined a daycare construction project at Sentara Martha Jefferson, work was already underway, and several mechanical challenges needed to be addressed. Working alongside Lantz Construction, the owner, and the engineer, our team stepped in to take on the mechanical scope and help find solutions that would keep the project moving forward.
At a Cargill Hatchery, replacing major mechanical equipment meant working around an operation that could not simply pause. The building needed to stay open, egg production needed to continue, and temperatures had to remain carefully controlled throughout the work.
At Virginia Poultry Growers Cooperative in Hinton, Virginia, Blauch Brothers is installing process piping for a new wastewater treatment building, planning every tie-in around a plant that never stops running.
At Daikin’s Verona office project, Blauch Brothers used coordinated plans and early site access to install overhead systems before the building was enclosed, helping avoid trade conflicts and keep construction on schedule.
Blauch Brothers is completing a multi-phase HVAC upgrade at Sandy Hook Elementary School in Strasburg, Virginia. This project spotlight focuses on Phase 1, which includes 2 new outside air units, 1 rooftop and 1 ground-mounted, along with new ductwork and gas piping. Blauch Brothers installed new ductwork for this phase and is installing the new mechanical systems throughout the existing building.
Blauch Brothers is currently designing and installing the complete plumbing and HVAC systems at the new Daikin Applied office building in Verona, VA. This project marks another milestone in our ongoing relationship with Daikin, following our successful industrial chiller replacement at their Verona production facility. Now, we are bringing that same standard of precision and reliability to their new office construction.
At Blauch Brothers, we are excited to help enrich the lives of our local community through our recent work on the Massanutten Waterpark expansion. For a project of this scale, the mechanical systems do more than just operate behind the scenes and they are critical to the guest experience and are prominently on display, serving both a functional and decorative purpose.
Blauch Brothers delivered the mechanical and plumbing scope at the UVA Credit Union headquarters in Charlottesville, VA, handling everything from underground infrastructure to final fixture installation.
At Blauch Brothers, we take pride in delivering mechanical systems that meet the highest standards of performance, precision, and reliability. Our recent project at Washington and Lee School of Business, reflects exactly that.
Blauch Brothers played a key role in bringing the first Buc-ee’s to Virginia, delivering large scale plumbing, piping, and HVAC systems for the 74,000 square foot Harrisonburg location.
When the company that builds chillers needs one replaced in its own facility, the standard is set higher than most projects. Blauch Brothers led the chiller replacement at Daikin's own production facility in Verona, Virginia, drawing on an existing preventive maintenance relationship that had already given our team a clear picture of where the equipment stood.
When the City of Harrisonburg upgraded its Public Works facility, Blauch Brothers handled the full mechanical scope, including HVAC, plumbing, and piping.
At Blauch Brothers, we are dedicated to providing mechanical solutions that enhance the environments where our communities learn and grow. Our recent HVAC upgrade at Frederick Douglass Elementary School in the Winchester area is a prime example of our commitment to delivering precise, high-quality work under demanding conditions.
When the scope of a project reaches 150,000 to 180,000 square feet, every decision made before construction begins carries weight. Blauch Brothers was brought on to handle the industrial process piping, large water systems, and full mechanical scope at the Bowman Andros facility in Mount Jackson, Virginia, a project that, at the time, stood as the largest the team had taken on.